In a proceeding before the Regulatory Commission of Alaska (RCA), assisted in developing a proposal for deferred recovery of capital costs associated with a newly built combined cycle natural gas power plant, whose addition to the electric utility’s rate base would otherwise result in a sudden and substantial rate increase.

Experts Involved