Analyzed and submitted written testimony in connection with the Competitive Process for Critical Transmission Infrastructure in Alberta, Canada. Constructed an illustrative financial model to show unintended consequences of the original RFP design that could have led to high-cost bid selection. The Alberta Electric System Operator accepted this analysis and revised the RFP rules.